Engineering, fabrication and installation of a 62 ft. center-to-center 24″ drag conveyor for Portland cement clinker.

Project included: increasing existing elevator height by 20 ft and upgrading the capacity with new buckets and gear drive, discharge chutes to existing silo and drag conveyor, discharge chute to new drag conveyor, 30 ft long stair-stepped discharge chute to deliver clinker to existing stacker belt, providing and installing a Stanum lift tube, along with dust collection piping and valves. The system delivers 120 tons per hour from an existing truck off-loading hopper.